
An overview of the BAI Vsat 13000 S Cafs fire-fighting vehicle from Brescia Antincendi International, which is built on a Scania L 360 8x2/6 chassis and is in service at the Mont Blanc tunnel.
Text and pictures by Gianenrico Griffini
For impossible missions in complex, high-risk operational environments, you need truly special lorries. Just like the four-axle Artemis fire and rescue vehicle – named after the Greek goddess symbolising protection and determination – fitted out by specialist firm BAI (Brescia Antincendi International) on a Scania L 360 8x2/6 chassis, which has entered service with the Mont Blanc Tunnel management company (TMB-GEIE). Pictured on these pages, the vehicle was previewed at Transpotec in Milan last May and is the first of a batch of four units ordered by TMB-GEIE to enhance its tunnel emergency response capabilities.
By capitalising on the Swedish manufacturer’s modular design concept, the company managing the transalpine tunnel has acquired a bespoke fire-fighting vehicle with a chassis-integrated body that is optimised in terms of kerb weight. This combination of structural robustness and high payload capacity complies with the 32-tonne gross vehicle weight limit. The compact 4,150 mm wheelbase between the first and third axles, combined with three-axle steering (first, second and fourth), ensures excellent manoeuvrability, even in confined spaces. This is essential for carrying out rapid U-turns in the tunnel (the truck’s turning circle is 9.3 metres) during firefighting and rescue operations. The Allison Transmission automatic gearbox is fitted with a torque converter and an integrated hydraulic retarder, as well as gear ratios that are optimised for the specific task at hand. This enables rapid acceleration, reduced response times, and the activation of the ‘Pump & Roll’ function. This involves activating the on-board pump to deliver a mixture of water and foam while the vehicle is in motion at speeds of up to 40 kilometres per hour. A quick-release water line system allows up to 320 metres of hoses, stowed in two roof-mounted boxes, to be deployed while the vehicle moves at speeds of up to 15 kilometres per hour. This further reduces response times.
The vehicle is fitted with a low-profile L cab suitable for two crew members in addition to the driver, who may be equipped with breathing apparatus. The L-cab ensures optimum direct visibility and is fitted with a kneeling function to facilitate firefighters' entry and exit. At the heart of the Artemis' powertrain is the Scania DC09 Euro VI engine: a five-cylinder in-line unit with a displacement of 9.3 litres and an output of 360 hp.
Unlike a standard fire engine, Artemis incorporates solutions specifically designed for tunnel safety. These include a front-mounted pusher for clearing obstacles, remote-controlled monitors, an infrared camera mounted beneath the windscreen for thermal imaging, and advanced driver assistance systems. One such example is the BAI radar, which is designed to cope with situations of poor or zero visibility caused by thick smoke. The vehicle is also fitted with a cab pressurisation system with an air reserve, a gas detector, and the Backeye 360 system from Brigade Electronics. This system combines four wide-angle cameras to provide a panoramic view of the truck.
Therefore, this is not a fire engine adapted for tunnel service, but rather a vehicle designed from the outset to tackle this specific operational scenario. Its fire-fighting system comprises a 12,000-litre water tank, two foam tanks containing 500 litres of Class A foam and 850 litres of Class B foam respectively, a two-stage centrifugal pump capable of delivering up to 4,500 litres per minute (FPN 10-4500 and FPH 40-400), and a state-of-the-art CAFS (Compressed Air Foam System) mixing system.
The Levia 1600 CAFS unit mixes water, foam concentrate and compressed air to generate different types of emulsion (dry, medium or wet), depending on the operational requirements. The operator can select these different mixtures from the driver’s cab, enabling optimal flame suppression and protecting firefighters from the heat generated by the fire, which is transmitted by radiation. To spray the water-foam mixture at the base of the flames, the Artemis is fitted with two adjustable monitor lances: an Idra 3 on the roof with a flow rate of 1 600 litres per minute and an Idra 2 mounted on the front bumper with a flow rate of 900 litres per minute. Both devices are operated via a joystick in the cab, where the LCD control panel is also located. Last but not least is the truck’s self-protection system. This sprays a mixture of water and foam beneath the vehicle, as well as atomised water, to protect the cab, bodywork and tyres.
The Importance of the Tunnel and Safety Procedures
The Mont Blanc Tunnel, which was completed in 1965, is 11.6 kilometres long (7.64 kilometres in France and 3.96 kilometres in Italy) and is one of the main transport routes across the Alps. Last year, between January and September, over 1.46 million vehicles passed through the tunnel in both directions, 360,000 of which were goods vehicles (light commercial vehicles and lorries). Over the same period this year, total traffic reached 1.54 million vehicles (450,000 lorries and vans). Given these traffic volumes, it is only natural that the tunnel management company should pay close attention to safety requirements. With this in mind, quarterly drills are organised to test the effectiveness of equipment and procedures in the event of serious incidents such as vehicle collisions and fires.
These drills provide an opportunity for all parties involved to implement the two safety plans – the Internal Intervention and Safety Plan (PIIS) and the Binational Rescue Plan (PSB) – and to improve mutual understanding of each other's methods and expectations. Once a year, a larger-scale drill involving external reinforcements is carried out under the authority of the Prefects. The PIIS is implemented whenever the alarm systems detect a serious operational fault in the infrastructure or the presence of a stationary vehicle in the tunnel for any reason. All possible scenarios are covered, including incident management procedures, operational protocols, the systems to be activated, and the personnel to be deployed (e.g. rapid response teams, fire brigades, evacuation assistants, and specialist technicians). The PIIS also sets out the timeframes for the deployment of external emergency services.
The Binational Emergency Plan is implemented when the severity and complexity of an incident makes it necessary to involve Italian and French public emergency services, such as the fire brigades of the Aosta Valley and Haute-Savoie, civil protection, medical units, and police forces. Supervision of the operations in this case falls under the authority of the Prefect of Haute-Savoie or the Aosta Valley, depending on the territorial jurisdiction determined by the location where the incident occurred.